Durham College - Main Campus
Replacement of Existing Camera System
With a bustling campus filled with thousands of students each day, work was scheduled so it would not interfere with daily operations. After hours work was also part of this job. There were approximately 128 cameras on their main campus system which made organization absolutely paramount on this project. Detailed notes and labelling of cables were made each day while the techs were working to ensure nothing was out of order. We were careful to minimize camera outages during the duration of this project.
Most of the existing cabling was coaxial so new DVR systems were installed to accommodate; 4 DVR's in total. All 128 cameras were checked for power before being replaced. If no power was detected, new power requirements were installed. After all equipment was replaced, the cabling in the rack needed a tidy. Unused cables were removed, cables were disconnected and re-routed and cables were labelled and cut back to eliminate extra unused length. Given the fact that there were over 150 existing cables, we were pretty satisfied with the results but more importantly, we were careful not to disturb their existing set up.
Before Photos - Existing Equipment
Old DVR
Multiple Camera Not Functioning
Old DVR
Multiple Camera Not Functioning
Rack Location
Lot of Excess Wiring and Unused Cables
Behind Rack
Unused Wires and Excess Cable Loops
After Photos - All DVR's and Cameras Replaced + Cable Management
New DVR
New DVR Unit, Cleaner Interface and No Camera Outages
New DVR
New DVR Unit, Cleaner Interface and No Camera Outages
Rack Location
All Wires Have Been Re-routed Organized
Behind Rack
Unused Wires Were Removed and Cables Trimmed Back